CEG recently completed design documents for a complete facility upgrade to accommodate the installation of a new 6,000 SF switch and DC Power installation. The project design includes:
- Complete Space Demolition and Renovation for Switch and DC Power Room areas
- Complete Main Electrical Service, Switchgear and Electrical Distribution for the facility
- Complete Replacement of the Facility Chilled Water System including 3 new 100 Ton Air Cooled Chillers and chilled water pumps
- Switch Room HVAC Systems including CRAC units and Air Distribution for up to 100 W/SF
- New Building DDC and Security Control Systems
- New Fire Detection and Suppression Systems
- Replacement of Standby Generator and Fuel Systems
- New Building Grounding Systems
- New Structural Upgrades to the building for Seismic Zone 4